Project #34: Sadr City WTP Enhancements #2
Customer: PCO
Contractor Name: Belew, Roland G GRC "Roland.G.Belew@usace.army.mil"
Location: Baghdad
Start Date: 10 Sep 08
Finish Date: 10 May 09
Brief Description: The objective of this contract is to enhance several important features required for safe and efficient system operation in Al Sadr City R3 Water treatment Plant.
1. Overflow discharge pipelines from the Intermediate Pump Station and Treated Water Pump Stations
2. Sun shades for sedimentation basins, intermediate pump station, treated water pump station, and filter building
3. Emergency stop switches (i.e. pumps)
4. Adequate handrails at the sedimentation basins
5. Hose wash-down station at the residual solids tank high side
       